Estrade
  • Finance
  • Real Estate
  • Tech
  • Education
  • Lifestyle & Leisure
  • Estrade Awards
No Result
View All Result
Estrade
  • Finance
  • Real Estate
  • Tech
  • Education
  • Lifestyle & Leisure
  • Estrade Awards
No Result
View All Result
Estrade
No Result
View All Result
Home Spotlight

Afcons Infrastructure Ltd: Delivers India’s Tallest Road Bridge

Team Estrade by Team Estrade
May 1, 2026
in Spotlight, Technology
0
Inauguration in process with Hon Chief Minister, Dy CMs and other dignitaries with Mr R Anantakumar, Director & Chief Operating Officer, Afcons

Inauguration in process with Hon Chief Minister, Dy CMs and other dignitaries with Mr R Anantakumar, Director & Chief Operating Officer, Afcons

Share on FacebookShare on Twitter

MUMBAI, India , May 1, 2026 /PRNewswire/ — The wait for safer and faster travel between Mumbai and Pune is finally over with the completion of the Mumbai–Pune Expressway Missing Link Project, with its inauguration at the hands of Honorable Chief Minister Devendra Fadnavis. The Missing Link Project, featuring India’s highest road cable-stayed bridge, bypasses the Khandala Ghat section.

The 650-metre-long viaduct features India’s tallest road cable-stayed bridge. This section is being executed by Afcons Infrastructure Ltd. At the 650-metre viaduct, engineers are constructing 182-metre (597 feet) high pylons, taller than the 128-metre (413 feet) pylons of the Bandra–Worli Sea Link, making it the highest bridge ever built for an Indian road project. Designed with four carriageways on each viaduct, the structure features a soaring 182–metre pylon and is supported by 240 cables.

“The journey to completion has been anything but easy. The bridge, located in the Sahyadri region, presented extreme challenges: narrow ridges left little room for heavy machinery, wind speeds could shift from a gentle breeze to violent blasts of 100 km/h within minutes, and monsoon rains turned cliffs into cascading sheets of water, halting work instantly. Fog often rolled in without warning, reducing visibility to just a few metres. Despite such formidable challenges, we are proud to deliver this engineering marvel,” said Krishnamurthy Subramanian, Executive Chairman, Afcons Infrastructure Ltd.

“Working at such heights, construction activities such as welding and segment lifting demand extraordinary precision, courage, and patience. Engineers and workers, often positioned on narrow ledges above deep valleys, operate under world-class safety and quality standards, using advanced construction methodologies to maintain both speed and accuracy,” said Ranjan Kumar Mishra, Project Director, Afcons.

Related Post

16 Alpha Appoints 22-Year-Old Priyanshu Priyank, Making Him India’s Youngest Fund Manager

16 Alpha: Appoints 22‑year‑old Priyanshu Priyank as India’s youngest fund manager

November 2, 2026
Panasonic and ANACITY signed a Memorandum of Understanding in Bengaluru to bring integrated smart-home solutions for residential communities in India

Panasonic Life Solutions India: Partners with ANACITY for Integrated Smart-Home Solutions

October 31, 2026

NPCI: Explores Who Pays for UPI and Future Plans

October 31, 2026

Manipal University Jaipur: Celebrates Day 1 of 13th Convocation with 4,100 Graduates

October 31, 2026

The Package II of the Missing Link Project, executed by Afcons, comprises two eight-lane viaducts, 850 metres and 650 metres long, along with the widening of the expressway from six to eight lanes over 5.86 km, and the construction of more than 10 km of approach and slip roads.

“The construction of the pylon shaft was carried out using a self-climbing shuttering system, defying gravity and the strong winds of the Sahyadris. For building the deck segments, four tower cranes at a height of 182 metres work in coordination with eight 350-ton cantilever form travellers (CFTs). Advancing gradually through open space, they construct the bridge’s deck segments one by one. The 182-metre pylons, visible from afar, will form part of a bridge rising over a deep valley, with each deck segment built with exceptional precision,” added Mishra.

  • Mumbai-Pune Expressway Missing Link Project (Package-II)
  • Bridge height: 136 metres (India’s tallest road cable-stayed bridge)
  • Tallest pylon: 182 metres
  • Viaduct I length: 850 metres
  • Viaduct II (cable-stayed) length: 650 metres
  • Expressway widening: From 6 to 8 lanes over 5.86 km
  • Approach roads: 10.2 km

Source: PR Newswire

Donation

Buy author a coffee

Donate
Tags: cable-stayed bridgeconstructionengineeringindiainfrastructureMumbai-Pune Expresswayroad project
Team Estrade

Team Estrade

Related Posts

16 Alpha Appoints 22-Year-Old Priyanshu Priyank, Making Him India’s Youngest Fund Manager
Finance

16 Alpha: Appoints 22‑year‑old Priyanshu Priyank as India’s youngest fund manager

by Team Estrade
November 2, 2026
Panasonic and ANACITY signed a Memorandum of Understanding in Bengaluru to bring integrated smart-home solutions for residential communities in India
Hot News

Panasonic Life Solutions India: Partners with ANACITY for Integrated Smart-Home Solutions

by Team Estrade
October 31, 2026
Nikhil Kamath Sits Down With The People Behind Your Payments Network to Ask Who Really Pays for UPI, and What Comes Next
Finance

NPCI: Explores Who Pays for UPI and Future Plans

by Team Estrade
October 31, 2026
Next Post
Hon’ble Dy CM DK Shivkumar, MP Tejaswi Surya, and other dignitaries inaugurated Bengaluru’s double-decker metro flyover at Silk Board today

Afcons Infrastructure Ltd.: Inaugurates Bengaluru Metro Stretch

Recommended

Innoviti Receives ASK Private Hurun India Unicorn & Future Unicorn Award (PRNewsfoto/Innoviti Technologies Pvt. Ltd.)

Innoviti Receives ASK Private Hurun India Unicorn & Future Unicorn Award

December 18, 2025

Ebix Inc.: Joins NeoProEd Insurance Conclave as Gold Partner in GIFT City

September 21, 2026
India's First Women's Pro Volleyball League Builds Squads with Rs 1.5 Crore Investment

Women’s Pro Volleyball League: Launches with Rs 1.5 Crore Player Investment

October 26, 2026
Noida Expressway Emerges As Ncr Apos S Fastest Growing Luxury Housing Corridor

ANAROCK: Noida Expressway Redefines Luxury Living

June 10, 2026
SPJIMR #2 in India and #15 globally in Financial Times

S.P. Jain Institute of Management & Research (SPJIMR): Ranks No. 42 in The Case Centre Impact Index 2026

November 2, 2026
CRIF Launches Ahmedabad Chapter of ‘Credit Goes to HER’ to Advance Women’s Financial Empowerment

CRIF: Launches Ahmedabad Chapter of Credit Goes to HER for Women’s Financial Empowerment

November 2, 2026
Deakin University and CHL partner with IIT Roorkee

IIT Roorkee and Deakin University: Launch Crisis Leadership Training

November 2, 2026
30 Sundays Releases Insights on How Bali Travel Has Changed for Indian Couples

30 Sundays: Indian Couples Shift to Split Stays and Island Overnights in Bali

November 2, 2026
Estrade

We are a business news focused digital platform. Our vision is to provide a stage to businesses and corporate houses who are on a growth trajectory.

Get in Touch : info@estrade.in

Stay ahead with Estrade Business Media

Get the latest in business!


    Categories

    • Education
    • Finance
    • Hot News
    • Lifestyle & Leisure
    • Real Estate
    • Spotlight
    • Technology

    © 2025 Estrade | Engineered by WEBINEERING.

    No Result
    View All Result
    • Finance
    • Real Estate
    • Tech
    • Education
    • Lifestyle & Leisure
    • Estrade Awards

    © 2025 Estrade | Engineered by WEBINEERING.